GRA Architecture
  • Home
  • Projects
    • Commercial >
      • California Democratic Party Headquarters
      • Franklin Ranch Veterinary Clinic
      • Ace Hardware
      • Pizza Guys
      • SBM Site Services
      • University Avenue
      • LB Construction
      • Sutter Data
      • Shadow Lakes
    • Education >
      • Alhambra Daycare and Classrooms
      • Hilton F. Lusk Center
      • Lincoln High School Modernization, Wood and Machine Shops
      • Lincoln High School, Engineering and Construction Academy
      • Lincoln High School Modernization, Computer Class and Student Store
      • Lincoln Aquatic Complex
    • Industrial >
      • Hansen Pipe and Products
      • Wholesale Trailer Supply
      • GMF Expansion
    • Civic >
      • Salvation Army Camp Del Oro
      • The Robert and Tilly Sinnet Youth and Community Center
      • Tri-Cities Corps Community Center
      • Ray and Joan Kroc Community Center
      • Concord Community Center
      • Alhambra Church
      • Salvation Army - B street Office and Housing
      • Penn Valley Fire Station No. 43
      • River Plaza
    • Under Construction >
      • Chico Country Day Charter School
      • Oakley Fire Station No. 55
  • About GRA
  • Contact Us

Lincoln Aquatic Complex

Client: Lincoln Unified School District
Project Location: Stockton, CA
Square Feet: 1,500
Construction Cost: $250,000
Architects: GRA Architecture

The Lincoln High School Aquatic building is a new facility at the high school’s existing pool complex. The Aquatic building is located at the high school sport facility entry on the south east side of the campus. Walkways connect students and visitors to other sport complexes and facility parking.

The new building was constructed to provide locker facilities, staff office space, and covered and open pool storage areas. Building materials of concrete block walls were used for both durability and ease maintenance. Interior finishes of sealed concrete block and slip resistant concrete flooring were selected for low maintenance. New multi-tiered landscaping incorporates drop off areas and out door seating areas which, although fenced for security, allow for campus views to the pool facility.
© 2014 GRA Architecture. All Rights Reserved. 205 23rd Street, Suite 130, Sacramento, CA 95816
Website by QuantumaxX