Hanson Pipe and Products
Hanson Pipe, a manufacturer of precast concrete pipe, required a new facility to house a new automated production line. The facility includes a 16,000 SF steam-curing chamber, a concrete batch plant, and automated pipe production machinery. Two 40-ton and one 10-ton overhead bridge cranes support the production process. The 54 acre site includes an exterior wet cast pipe production line and product storage.
An additional 5,000 SF freestanding office building was built to house Hanson’s...
|
|
|
General Mail Facility ExpansionThe General Mail Facility serves as the Headquarters for the Sacramento Valley Division of the United States Postal Service. The 100,000 SF office building houses the central computer system, credit union and executive offices for the Division. All postal operations for the Sacramento Valley are coordinated from this facility.
The 82 acre site was master planned for future expansion of the administrative offices, the main workroom and a warehouse. GRA Architecture was commissioned to design the...
|
|
|
Sutter Health Care Data CenterOriginally designed and built for TELEGIS, an internet hosting site, the facility includes a 24,000 SF raised access floor data center, UPS Battery Backup, and three emergency generators that provide N+1 power backup for the entire site.
The security system includes a level three bullet resistant lobby, one way security trap with piggyback detection and a complete interior and exterior video camera surveillance system.
The facility now houses the compete data system for the Sutter Health...
|
|
|
Wholesale Trailer SupplyThis distribution facility includes 24,000 SF of two story office space, and high-piled parts storage. Loading docks with dock levelers accommodate semi tractor trailers.
|
|