|
Lincoln High School Construction and Engineering AcademyThe 8,060 s.f. technical career center provides Lincoln High School students development in the field of engineering and construction.
The building is designed as a teaching facility, exposing structural building elements as a teaching display. Mechanical systems are displayed, the main electrical room is completely exposed in a glass vault, structural steel connections are exposed, and electrical raceways are highlighted by surface mounted raceways and cable trays. The building exterior materials of CMU...
|
|
|
Lincoln High School, Moderinzation Wood and Machine ShopsThe modernization project provides Lincoln High School with a new wood, and machine shops. The modernization of the existing buildings is in conjunction with the engineering and construction academy program providing students with new shop area, classrooms and outdoor construction areas.
The buildings interior, exterior and it’s mezzanine areas were completely gutted down to the existing structure to accommodate all new programmed spaces, new mechanical, electrical systems. The communication and data...
|
|
|
Lincoln High School Modernization, Computer Classroom and Student StoreThe modernization of the existing buildings is in conjunction with the engineering and construction academy program providing students with new shop area, classrooms and outdoor construction areas.
The buildings interior, exterior and it’s mezzanine areas were completely gutted down to the existing structure to accommodate all new programmed spaces, new mechanical, electrical systems. The communication and data systems were upgraded. The existing mezzanine space was reduced in size to allow for new...
|
|
|
Lincoln High School Aquatic ComplexThe Lincoln High School Aquatic Center is a new building at the existing high school pool complex. The Aquatic Center is located at the high school sport facility entry on the south east side of the campus. Walkways connect students and visitors to other sports complexes and facility parking.
The new building was constructed to provide locker facilities, staff office space, and covered and open pool storage areas. Building materials of concrete block were used for both durability and ease of...
|
|
|
Lincoln High School Women's Field Locker Room - Phase IPhase I of the three phases, the Women's Field Locker facility was part of the Districts modernization program. Phase II will consist of an adjoining Men's Locker Room facility, and Phase III will consist of all new filed bleachers and accessible pathways.
The Women's Field Locker facility program consisted of lockers, bathroom and equipment room. Building materials consisted of split face and precision CMU. Painted and standing seam roof was selected for use to maintain desgn concept and also...
|
|